Who? Mustang Energy
Where? The Spur Project is located approximately 40 km southeast of Key Lake Operation
What type of activities will occur? Mineral exploration activities, including:
• The crew will access the property via float or ski equipped aircraft, helicopter and along trails once on site
• The drilling crew will consist of up to 18 people on site for a duration of 48 weeks
• The geophysical crew will consist of up to 5 people on site for a duration of 6 weeks
• The line cutting crew will consist of up to 5 people on site for a duration of 6 weeks
• One temporary work camp is being requested, occupying less than 0.5 hectares
• Up to 20 drill holes are being proposed, with 10 on land and 10 on ice
• Helicopter pads may be established to assist with the drilling program
• Approximately 20 km of ice roads, 3 km of new trails and 50 km of existing trails will be utilized
• Up to 70 km of new line will be established for the geophysical program
When will these activities occur (Estimated Permit Length)? May 2025 to April 2028