Duty to Consult: Foremost Murphy Lake Project

Who? Foremost Clean Energy

Where? The Murphy Lake Project is located approximately 30 km northwest of Points North Landing

What type of activities will occur? Mineral exploration activities, including:

Diamond Drilling

• Maximum of 30 drill locations

• 20 drill collars on land

• 10 drill collars on ice

• Maximum drill pad size – 30 m x 30 m (900 m²)

• Up to 10 km of new trails and 8 km of ice roads

• Up to 50 km existing trails utilized

• Helicopter assisted, helicopter pads will be required

• Drill holes may be located within the 30-100 m of shoreline buffer zone

• Borehole Geophysical surveys

Line Cutting and Ground Geophysical Surveys

• Access to grid locations will be helicopter supported or by existing access trails. No new trails are anticipated

• Up to 60 km of new grid lines

• Up to 63 km existing grid lines

• Up to 60 km line slashing

One Temporary Work Camp

• Up to 1 ha (100 m x 100 m) in size

• Historical location, no clearing anticipated

When will these activities occur (Estimated Permit Length)? June 2025 to Dec 2027