Duty to Consult: Foremost Turkey Lake Project
Who? Foremost Clean Energy
Where? The Turkey Lake Project is located 38 km northeast of Points North
What type of activities will occur? Mineral exploration activities, including:
•Up to 75 drill holes (up to 50 on land and up to 25 on ice)
•Maximum drill pad size – 30m x 30m (900 m2)
•Up to 25 km of new trails and 8 km of ice roads
•Up to 50 km of existing trail utilized
•Helicopter assisted, helicopter pads will be required
•Drill holes may be located within 30 – 100 meters of the shoreline
•Line Cutting and Ground Geophysical Surveys
•Access to grid locations will be helicopter supported or by existing access trails. No new trails are anticipated for the line cutting work.
•Up to 60 km of new grid lines
•Up to 50 km of existing grid lines
•Up to 60 km of line slashing and 50 km of refurbishing
•Up to 50 km of existing trails may be utilized
•Up to two temporary work camps
When will these activities occur (Estimated Permit Length)? November 2025 to December 2028