Duty to Consult: Purepoint Uranium’s Russell South Project

Who? Purepoint Uranium

Where? The Russell Lake South project is located 150 km southwest of Hatchet Lake/Wollaston Lake Post

What type of activities will occur? Mineral exploration activities, including:

Diamond drilling program:

• Drilling proposed at 15 proposed locations on land. Maximum drill pad size is 30 m by 30 m

• No new trails will be established

• Site will be accessed by helicopter. Helicopter pad size is 30m by 30m or natural clearings will be used

Soil sampling:

• Up to 5000 soil samples will be collected using trowels and soil auger

• No line cutting or trails will be established

• 137 km of line cutting (new grid) is proposed

• Ground geophysical surveys

• Field crews will be housed at Lamplighters Lodge or South Point Camp. Temporary Work Camps will be established for soil sampling

When will these activities occur (Estimated Permit Length)? 2026-2028

Next
Next

Duty to Consult: Orano’s Moore Tomblin Project