Duty to Consult: Foremost Hatchet Lake Project
Who? Foremost
Where? The Hatchet Lake Project is located 60 km northwest of Hatchet Lake
What type of activities will occur? Mineral exploration activities, including:
Diamond Drilling
• Up to 50 drill holes (up to 35 on land and up to 15 on ice)
• Maximum drill pad size – 20 m x 20 m (400 m2)
• Up to 10 km of new trails and 8 km of ice roads
• Up to 50 km of existing trail utilized
• Helicopter assisted, helicopter pads will be required
• Drill holes may be located within 30 – 100 meters of the shoreline
Line Cutting and Ground Geophysical Surveys
• Access to grid locations will be helicopter supported or by existing access trails
• No new trails are anticipated for the line cutting work
• Up to 60 km of new grid lines
• Up to 63 km of existing grid lines
• Up to 60 km of line slashing and refurbishing
• Up to 60 km of existing trails may be utilized
One Temporary Work Camp
• Up to 1 ha in size
• Two locations provided but only up to one temporary work camp will be utilized
When will these activities occur (Estimated Permit Length)? December 2025 – December 2028