Duty to Consult: Purepoint’s Dorado JV Project
Who? Purepoint
Where? The Dorado JV project is located 14 km northwest of Points North
What type of activities will occur? Mineral exploration activities, including:
• Up to 60 drill locations on land and 20 on ice. Although up to 80 drill holes are being requested, likely only 30-40 holes would be drilled.
• Maximum drill pad size is 30 m by 30 m.
• Up to 50 km of new trails, up to 10 km of ice roads, and use of up to 48 km of existing trails.
• Site would be accessed by helicopter or float plane in summer and either helicopter, snowmobiles, and or UTVs in winter.
• Helicopter pad size is 30 m by 30 m or natural clearings would be used.
• Up to 100 km of line cutting, although likely only 25 – 50 km would be cut.
• Up to 100 km of line slashing.
• Ground geophysical surveys would be completed using snowmobiles, UTVs, and existing trails or helicopter.
• Electromagnetic, resistivity and ground gravity surveys are also proposed throughout the project.
• Field crews will be housed at either Points North or at an already established temporary work camp at Turner Lake Camp.
When will these activities occur (Estimated Permit Length)? 2026 -2029